Икономика••NEXORA Editorial•n.yam.com
Su Ching-chuan proposes faster construction of Kaohsiung–Pingtung road link

Related stories
Summary
Su Ching-chuan proposed accelerating the construction of the “Pingbei 2” project by using prefabricated components and awarding separate sections in parallel. The aim is to open the road link between Kaohsiung and Pingtung earlier.
Details
Su Ching-chuan has proposed measures to accelerate construction of the “Pingbei 2” project, which is intended to connect the transport networks of Kaohsiung and Pingtung. The proposals include using prefabricated construction components and awarding separate sections of the project in parallel.
According to the available information, these approaches could allow work on different parts of the route to proceed at the same time rather than sequentially.
The proposal is aimed at completing and opening the road link earlier. The available information does not specify a detailed schedule, project cost or expected opening date.
NEXORA AI — Why it matters
The proposal could affect the pace of construction of a planned transport link between Kaohsiung and Pingtung.
NEXORA PRO
Unlock detailed analysis, key facts, context, story developments, source comparisons, a personalized feed and smart alerts.
Explore NEXORA PRO